the development of the new meadow continues and each week the site takes more and more shape.
the north, east and west stands are well under way with the steelwork in place and the concrete terracing being fitted. the brickwork has started
under the east and west stands with many of the areas begining to be visable.
the work on the pitch is well underway with it being built up in layers, the drainage has been installed and the different levels are being layed over the next few weeks.
the training pitch to the south of the site is also being prepared.
the car park area is taking shape with the drainage in place that will regulate the water off the site.
the latest set of pictures are up in the pictures/walk and pictures/library so take a look.
the north, east and west stands are well under way with the steelwork in place and the concrete terracing being fitted. the brickwork has started
under the east and west stands with many of the areas begining to be visable.the work on the pitch is well underway with it being built up in layers, the drainage has been installed and the different levels are being layed over the next few weeks.
the training pitch to the south of the site is also being prepared.
the car park area is taking shape with the drainage in place that will regulate the water off the site.
the latest set of pictures are up in the pictures/walk and pictures/library so take a look.